Legal document requirements for starting a solar installation business

When launching a solar installation business, it is imperative to have all legal documents in place before setting foot on a rooftop, writes Robert Chen, senior lawyer at LegalVision.

Clean energy is becoming increasingly important to many Australian households and businesses. If you have previously worked in a related industry, you may be looking to capitalise on the trend and start a solar installation business. If so, it is important you establish your new business with sound legal documents in place. Doing so allows you to clearly state how your commercial relationships with suppliers and consumers will operate; limits your liability; and reduces the risk of a dispute arising.

This article will outline what licences you need to start your business and what to look for in your terms of trade and supply agreement.

What licences do I need?

Before you start your business, make sure you are licensed to install solar panels. Each state has different licensing requirements. For example, in NSW you must hold building and electrical contractor licences to install solar panels on the roof of a residential property or other premises.

A building contractor may enter into contracts to install solar panels, but somebody holding an electrical licence must also be hired under the contract. This person must carry out all required electrical wiring work. Regardless of whether the premises are residential, commercial or industrial, it is illegal to conduct electrical wiring work without an electrical contractor licence or an electrical qualified supervisor certificate, or without the supervision of the holder of an electrical qualified supervisor certificate.

If you plan to connect premises to the electricity distribution network, you must meet further qualification requirements and be an accredited service provider.

What will my terms of trade be?

Once you have confirmed you meet your state’s licensing requirements, you should prepare a business plan. You will then need to draft your terms of trade. These terms outline the terms and conditions under which you will install the solar panels. You will need to enter into contracts outlining these terms with your clients.

Residential building work is governed by different laws in each state so you may need to prepare separate sets of terms if you are installing solar panels at both residential and commercial premises.

In NSW, there are mandatory requirements for what you should include in a residential building contract. These requirements depend on the price of the contract. If the residential building work is worth between $5000 and $20,000, you will need a small jobs contract. If the work is worth more than $20,000, it requires a more detailed home-building contract.

Robert Chen, senior lawyer at LegalVision. Photo: LegalVision.

Goods and services

Your terms should clearly outline the nature of the goods and services you are providing. In this case, the goods will be the solar panels, assuming you are also selling these to the client, while the services will be the installation of the solar panels.

If this is left unclear, the goods and services you provide might not meet your clients’ expectations. If this happens, your clients may request that you provide additional goods and services at no further cost.

Pricing, invoicing and payment

Getting paid is important to all business owners. Your terms should clearly set out how payment will work. Consider what price is due upfront; what price is due during the course of the project; and when any further costs are due.

It should also be clear what happens if clients fail to make their payments. For example, if payment is not made, you could cease to provide the goods and services until the amount is paid. You could also charge interest on any outstanding amounts.

Warranties

Warranties are assurances that you should try to obtain from your client. For example, you will want to ensure the premises is safe for your workers; the client has the relevant permissions to have the solar panels installed; and the client is the lawful owner of the premises or has the permission of the lawful owner to have the solar panels installed.

Termination

In most cases, installation of the solar panels will take place as planned. However, you should set out what happens if one party wants to terminate the terms. The termination clause should outline when a party may terminate the terms, and what the consequences will be.

For example, if your client terminates the contract, you will need to know whether you can retrieve the solar panels from the premises and charge your client additional costs of doing so.

Supply agreement

Most owners of a solar installation business will need to source their solar panels from a supplier. Finding a good supplier is crucial and they will directly affect the reputation of your business.

Once you have found a supplier you are happy with, you will enter into a supply agreement with them. Some of the key clauses to consider in your agreement are outlined below.

Product appointment types

You should negotiate whether the agreement will be exclusive (you are the only solar installation business that can sell these solar panels in the area) or non-exclusive (the supplier can sell to your competitors).

This is a key clause. Make sure you discuss it with your supplier before having any contracts drawn up.

Goods and price

A key concern will be what goods you are getting and for what price. You may need to order a wide range of goods from your supplier. Goods and prices may also vary from order to order.

If you have negotiated a good price for the goods, it is important to ensure your agreement specifically indicates this is the agreed price.

Forecast

A forecast clause requires you to provide the supplier with an estimate of how many solar panels you will need in the future. This can work in your favour as the supplier will be aware of how many solar panels you are likely to need. The supplier can then ensure they have enough stock.

Order and delivery process

Be very clear what happens after you have placed an order with your supplier. Your order should set out:

  • How many solar panels or parts are being ordered.
  • What the specifications of the model are.
  • Where the solar panels are being delivered to.
  • When the solar panels are being delivered.

Defects

Receiving defective solar panels from your supplier could damage your business. It is very important your supply agreement addresses what will happen if the supplied goods are defective.

Usually, you must notify the supplier that the goods are defective within a set time. The supplier may then resupply the goods or provide a refund.

You should also ensure the supplier provides warranties assuring you of the quality of the goods they are supplying. For example, the supply agreement should expressly provide warranties relating to the quality of the goods; whether the goods are fit for purpose; and whether the goods are of merchantable quality (generally of a suitable quality).

It is important these warranties are set out in writing so you can rely on them if the goods do not meet such criteria.

Key takeaways

Starting your own solar installation business may be a profitable decision. Before you start your business, ensure:

  • You are licensed to carry out the work.
  • You have found an appropriate supplier.
  • You have clients who want your services.

When you start engaging suppliers and clients, you should already have your business’s terms of trade drafted and your supplier agreement formalised in a contract. This ensures that how your business relationships work is clear to all parties.

If you need help starting your solar installation business, LegalVision’s experienced contract lawyers can assist as part of a membership. For a low monthly fee, you will have unlimited access to lawyers. Call LegalVision on 1300 544 755 or visit legalvision.com.au.