In Australia’s current climate of extreme weather and bushfires, businesses participating in demand response are playing an important role in maintaining system security and stability, write Rando Yam and Zac Hardie of Enel X.
Read More
Mike Cannon-Brookes, 5B Solar and Tesla launch energy collective to buttress burnt-out towns
A new venture set up to provide energy generation in towns affected by recent bushfires is preparing to install stand-alone solar-and-battery systems at up to 100 sites around Australia.
Read More
Read More
Solpod pushes a take-it-with-you C&I solar solution
A modular form of PV that can match the long-term potential of solar with the short-term nature of tenancy is being trailed across Australia.
Read More
Read More
WePower platform enables 10-year PPA
It is the first time a PPA transaction was executed using a fully standardised and digitised contractual architecture.
Read More
Read More
Microgrids: how to keep the power on when disaster hits
It’s timely to consider how we can build a better system – one that’s more resilient in times of disaster and also doesn’t contribute to making disasters more frequent.
Read More
Read More
How an Aussie invention could soon cut 5% of the world’s greenhouse gas emissions
A technological arms race in the 1980s resulted in a world-first solar cell, that today underpins half the world's solar power.
Read More
Read More
All aboard for solar training
As demand for PV keeps building Australia’s solar training organisations are preparing the next wave of qualified installers, writes Jeremy Chunn.
Read More
Read More
United Energy trials pole-mounted shared battery storage
The solution will make the most of surplus solar that is exported to the grid around midday, when voltage levels can rise on feeder lines where PV is popular with homeowners.
Read More
Read More
Singapore’s Vena Energy begins 150MWh Qld storage project
Vena Energy Australia will build, own and maintain the BESS while energy retailer AGL will have full operational dispatch rights under a 15-year agreement between the two companies.
Read More
Read More
SA backup plan seeks 20MW in demand-side capacity
The program will bring about 20MW of demand-side generation capacity into the NEM over the three-year trial.
Read More
Read More